Marshalls Cobbletech Driveway Orrell Park
Date Completed: 20/08/2012In this project we were transforming the existing driveway by installing new Marshalls Cobbletech in basalt colour. We designed the border using Marshalls Drivesett Argent in light colour with Drivesett kerbs...
Garden Makeover Including Decking, Paving & Pond
Date Completed: 11/05/2011We were installing a lower decking area and an upper deck with steps joining the two levels, and a retaining wall both side of the steps using also decking. We were...
Marshalls Driveline 50 Block Paving Patio Huyton
Date Completed: 05/05/2011This project had two phase. In phase one we installed Marshalls Driveline 50 block paving around the conservatory. In the second phase, we installed Marshalls Driveline 50 block paving around...
Decking, Raised Planters & Feature Step Netherton
Date Completed: 22/03/2011This project was carried out in the Netherton area of Sefton in Merseyside. We supplied and installed a new raised decking area, creating a box planter feature along with...
Rear Garden Makeover Aigburth
Date Completed: 17/01/2011We were completely transforming the rear garden with our landscape design. The transformation consists of a new Marshalls natural stone patio, a paving circle feature, decorative gravel and stepping stones, a...
Tarmac Driveway Childwall Liverpool
Date Completed: 11/01/2008This project was carried out in the Childwall area of Liverpool in Merseyside. Here we transformed the driveway by installing black tarmac with a kerb edging. We also constructed...
Garden Makeover & Driveway Transformation Garston
Date Completed: 21/05/2009This project had two phases. Phase one was a garden makeover to transform the rear garden by installing three new patio areas using natural stone. The first patio is...
Paving Half Moon Step Allerton
Date Completed: 04/09/2009This project was to construct a half moon step using natural stone and concrete key kerbs as the risers up to the raised garden. We originally installed a natural stone patio during 2008...
Southport Flower Show 2007
Date Completed: 20/04/2007“Harmony” – Designed and constructed by Darren Moss This project was carried out in August 2007 with our bricklayer and the director of the company Mr Darren Moss. We were...
Marshalls Driveline 50 Block Paving Huyton
Date Completed: 21/11/2007This project was carried out in Huyton. Here we installed Marshalls Driveline 50 to the front driveway. We also installed a new step by the front door, raised kerbs...
What Our Customers Say
We are delighted with our new patio! The flags used are Marshall’s vitrified which are non porous so dirt will run off very easily. We were looking for a low maintenance product and we feel that Abel have sorted this for us besides giving us an extremely attractive final result.
Pauline Roy