Request a call back

Garden Makeover Including Decking, Paving & Pond

Before
After 10 Days
Date Completed: 11/05/2011

We were installing a lower decking area and an upper deck with steps joining the two levels, and a retaining wall both side of the steps using also decking. We were also installing a natural stone patio to the upper-level garden, leaving a smaller space between the pond and the deck for a planting area. We also were tidying up the rest of the garden area including the pond.

Project Progress

Similar Projects

Garden Transformation with Outdoor Bar Ormskirk READ MORE
Rockery Water Feature And New Fence Formby READ MORE
Modern Water Feature With LED Lights Ormskirk READ MORE
Click Here To View All Our Projects...

What Our Customers Say

We are delighted with our new patio! The flags used are Marshall’s vitrified which are non porous so dirt will run off very easily. We were looking for a low maintenance product and we feel that Abel have sorted this for us besides giving us an extremely attractive final result.

Pauline Roy