Garden Makeover Including Decking, Paving & Pond

Before
After 10 Days
Date Completed: 11/05/2011

We were installing a lower decking area and an upper deck with steps joining the two levels, and a retaining wall both side of the steps using also decking. We were also installing a natural stone patio to the upper-level garden, leaving a smaller space between the pond and the deck for a planting area. We also were tidying up the rest of the garden area including the pond.